Building for the future at Hinkley Point C
The Hinkley Point C nuclear power plant is one of the largest construction projects ever undertaken in the United Kingdom. The enormous site, covering over 400 acres of land, will feature two European Pressurised Reactors, generating over three thousand two hundred megawatts of power, which will account for seven percent of the electricity needs of the United Kingdom.
With a site this large, it is crucial that the construction teams can accurately, and safely, survey and monitor the site throughout the construction process, increasing their efficiency, reducing costs, and ensuring that the thousand plus workforce are kept safe at all times. With Leica Geosystems solutions, construction workers were able to embrace the latest technology throughout the construction process.
With a site this large, it is crucial that the construction teams can accurately, and safely, survey and monitor the site throughout the construction process, increasing their efficiency, reducing costs, and ensuring that the thousand plus workforce are kept safe at all times. With Leica Geosystems solutions, construction workers were able to embrace the latest technology throughout the construction process.